Archive for July 2010

Summit Design: Long-Span Trusses are Installed at Brentwood Fire Station

Summit Engineering recently performed construction observation on the installation of 90-foot clear span trusses at the new Brentwood Fire Station. The new fire station was designed by the team of Summit Engineering, Ricci Construction and TRH Architects. In addition to the building design, Summit Engineering prepared the erection plan for the unwieldy trusses. The plan [...]